Hello Adrian
I have gone ahead and created a Context diagram which shows the goals and scope of the project. I have not gone into the details and functionalities which I thought I will do with a use case model or a level 1 diagram. I am going ahead and uploading the Context diagram file.
For our team members, let me brief you about this project. Bank ATM Example. The requirements of this project have already been gathered and noted. I am pursuing it further by creating high level design with a context diagram and then going into the functionalites with a use case model. The link to the existing Project is Requirements Role-play: Bank ATM Example thread.
Adrain, have a look at it and tell me where I am going right or wrong .
Thanks:- Jay