Friday, May 24, 2013

   Quick Links:   Articles     MA Blog     Community Blog     Templates     Books     BA Humor     Events     Jobs     Interview Questions         RSS Feeds

Business Analyst Articles: Business Analysis & Systems Analysis

Resources




BA ARTICLE ARCHIVE
» May 2013 (6)
» April 2013 (8)
» March 2013 (4)
» February 2013 (6)
» January 2013 (6)
» December 2012 (5)
» November 2012 (7)
» October 2012 (6)
» September 2012 (6)
» August 2012 (5)
» July 2012 (9)
» June 2012 (5)
» May 2012 (9)
» April 2012 (7)
» March 2012 (7)
» February 2012 (5)
» January 2012 (7)
» December 2011 (6)
» November 2011 (6)
» October 2011 (8)
» September 2011 (6)
» August 2011 (8)
» July 2011 (7)
» June 2011 (7)
» May 2011 (6)
» April 2011 (8)
» March 2011 (6)
» February 2011 (5)
» January 2011 (6)
» December 2010 (5)
» November 2010 (9)
» October 2010 (5)
» September 2010 (6)
» August 2010 (8)
» July 2010 (6)
» June 2010 (6)
» May 2010 (10)
» April 2010 (5)
» March 2010 (8)
» February 2010 (7)
» January 2010 (7)
» December 2009 (7)
» November 2009 (7)
» October 2009 (6)
» September 2009 (8)
» August 2009 (10)
» July 2009 (9)
» June 2009 (5)
» May 2009 (10)
» April 2009 (5)
» March 2009 (12)
» February 2009 (8)
» January 2009 (6)
» December 2008 (9)
» November 2008 (8)
» October 2008 (9)
» September 2008 (4)
» August 2008 (6)
» July 2008 (8)
» June 2008 (17)
» May 2008 (12)
» April 2008 (7)
» March 2008 (21)
» February 2008 (16)
» January 2008 (13)
» December 2007 (9)
» November 2007 (25)
» October 2007 (2)
» September 2007 (23)
» August 2007 (12)
» July 2007 (11)
» June 2007 (7)
» May 2007 (6)
» April 2007 (9)
» March 2007 (5)
» February 2007 (3)
» January 2007 (2)
Articles and White Papers
Minimize


Current Articles | Search | Subscribe (RSS)

» Estimating by Percentages

Statistics:Article Rating (3105 Views) (0 Comments) Print
Posted: Thursday, March 06, 2008
Categories: Project Management, SDLC, Process, and Methodologies, Estimation

"Remember, it's Ready, Aim, Fire; any other sequence is counterproductive."
- Bryce's Law

Having been involved with the systems methodologies field for over 30 years I have been occasionally asked what percentage of time in a project should typically be devoted to a specific phase of work, for example a Phase 1 Feasibility Study, Phase 2 Systems Design, etc. Basically, the reason the person wants to know this is to use it as a means for estimating the remainder of the project. For example, if I were to say Phase 1 represents 10% of the overall project, they would simply multiply the amount of time spent in Phase 1 by ten. This is an unreliable approach for estimating which is why I usually balk at giving out such figures.

Systems development projects vary in size from large to  small and although statistics should certainly be maintained, I still consider this an erroneous approach to estimating. Instead, I recommend basing an estimate on a rough design of the product to be built (the system), including all of its pieces and parts, such as inputs, outputs, files, records, data elements, etc. Some of these components may be reused from other systems, some may require modification, and some may be entirely new. This is called estimating based on the system's "Bill of Materials," a simple concept derived from engineering and manufacturing. Even if a project only involves a single program (as opposed to a major system), I would still examine the types and number of components affected by the assignment.

Having said all of this, let me give you my spin on the proportion of work in the typical systems development project. I have seen many companies skip through the early phases in order to get to the programming phases which is considered the important work. Under this scenario, programming represents 85% of the project. Instead I advocate more time spent in the early phases for better clarity of requirements definition and for producing better specifications for the programmers and DBA's to follow. Under this scenario, I see as much as 60% in the early phases involving systems analysis and design, 15% in programming, and 25% in implementation and review. You heard right, 15% in programming. Why the disparity? Simply because programmers have long suffered from the lack of decent specifications and end up spinning their wheels over and over again trying to deliver what is needed. But if you concentrate on better specifications upfront, the guesswork is eliminated for the programmer.

Some people consider the upfront work to be somewhat frivolous, that the "real work" is down in programming. I don't know why this is, perhaps programming is more tangible since screens and reports can be visibly shown to people. But I do not subscribe to this notion, and believe the vital work to be in the early phases, but then again, I am considered a dinosaur by the "Agile" methodology people. Regardless, if you have to build anything of substance, be it a bridge, a skyscraper, an automobile, or a system or a single program, you have to do your homework first, otherwise you find yourself constantly tearing things down and rebuilding them over and over again. If we built bridges the same way we build systems in this country, this would be a nation run by ferryboats.

One last word on applying percentages to project estimates, the danger here is that you might calculate you are 90% complete; inevitably you will discover the last 10% will take forever. So, my recommendation is to avoid the percentage trap and consider the Bill of Materials you are going to work on instead.

If you would like to discuss this with me in more depth, please do not hesitate to send me an e-mail.

Keep the faith.

About the Author

Tim Bryce is a writer and management consultant with M. Bryce & Associates of Palm Harbor, Florida and has over 30 years of experience in the field. He is available for lecturing, training and consulting on an international basis. He can be reached at timb001@phmainstreet.com
Comments and questions are welcome.

His writings can be found at:

http://www.phmainstreet.com/timbryce.htm

"PRIDE" is the registered trademark of M. Bryce & Associates (MBA) and can be found on the Internet at:
http://www.phmainstreet.com/mba/pride/

The "Management Visions" Internet audio broadcast is available at:
http://www.phmainstreet.com/mba/mv.htm

Copyright © 2008 by Tim Bryce. All rights reserved.

 


Rating
Comments
Only registered users may post comments.
  

Do you twitter?: If you want short updates on what's going on in the BA world and at ModernAnalyst.com, simply follow us on Twitter: http://twitter.com/ModernAnalyst



 

Privacy Statement  |  Terms Of Use
Copyright 2006-2013 by Modern Analyst Media LLC